Transmission


Neoenergia operates in the electric power transmission sector with long-distance high-voltage transportation to the National Interconnected System - SIN. Between assets in operation and under construction, we maintain 15 transmitters. There are more than 6 thousand km of lines, spread across 13 Brazilian states.

Ventures in operation

Assets in operation

Neoenergia | Dourados

The Neoenergia | Nova Porto Primavera — Rio Brilhante Transmission Line, from the Dourados project, is the first delivery of lot 4 of the auction held by ANEEL in April 2017, which will strengthen the electrical system in Mato Grosso do Sul. In this first phase, two substations were expanded and 327 towers were built over 147 kilometers long. The last one to be hoisted, about 80 meters high, is located inside the Paraná River, making the implementation more complex because it requires the assembly to take place gradually, using vessels and cranes.

location_on

Mato Grosso do Sul

calendar_month

2017 auction

cell_tower

Start of operation August/21

monetization_on

R$ 89 million (RAP)

Neoenergia | Affluent Electric Power Transmission

Also known as Afluente T, it operates substations in the state of Bahia, connected to a total of 489 km of transmission lines. With an installed capacity of 600 MVA, the company was established in 2009, under the control of the Neoenergia Group (87.8%).

location_on

Bahia

calendar_month

2009 auction

cell_tower

Start of operation 1990

monetization_on

R$ 68 million (RAP)

Neoenergia | SE Narandiba S.A.

Closed company, established on August 18, 2008, with headquarters in Rio de Janeiro. The company is a specific purpose company (SPE) and has a 100% interest in the Narandiba, Brumado II and Extremoz II Substations. The project was built to strengthen the energy supply of the Metropolitan Region of Salvador and has 700 MVA of installed power, through three 230/69 kV transformers. Made with cutting-edge equipment - such as Gas Insulated Switchgears (GIS) and Plug And Switch System (Pass) -, it offers greater reliability and safety in the services provided. Since its inception, it had a low socio-environmental impact and was built on the basis of waste management and effluent treatment programs.

location_on

Bahia

calendar_month

2008 auction

cell_tower

Start of operation June/08

monetization_on

R$ 16 million (RAP)

Neoenergia | Potiguar Sul Power Transmission S.A.

A privately held company, wholly controlled by the Neoenergia Group. Established on August 13, 2013, the company is responsible for the implementation, operation, and maintenance of Neoenergia's first 500 kV power transmission line. The term for granting the service is 30 years.

location_on

Rio Grande do Norte/Paraíba

calendar_month

2013 auction

cell_tower

Start of operation November/16

monetization_on

R$ 32 million (RAP)

Neoenergia | Atibaia Energy Transmission S.A.

It is part of lot 20, won by Neoenergia in the 05/2016 transmission auction held by the National Electric Energy Agency (ANEEL). The lot includes the expansion of the Ferhão Dias 500/230 kV substation through the installation of a 500 kV Static Compensator (-150/+300 Mvar), which reinforces the National Electrical System in the southeastern region of the country.

location_on

São Paulo

calendar_month

2017 auction

cell_tower

Start of operation December/19

monetization_on

R$ 18 million (RAP)

Neoenergia | Biguaçu Transmission

Neoenergia project, which is part of lot 22, purchased at ANEEL's transmission auction no. 05/2016, held by the National Electric Energy Agency (ANEEL) in April 2017. Located in the state of Santa Catarina, in the southern region of the country, the project consists of the expansion of the SE and construction of a Static Reactive Compensator (-100/+300 MVAR), a cutting-edge technology to, among other functions, regulate the voltage in the network to reduce the variations caused by shutdowns or instabilities, reinforcing the region's electrical system, guaranteeing more safety and reliability to it.

location_on

Santa Catarina

calendar_month

2017 auction

cell_tower

Start of operation July/20

monetization_on

R$ 18 million (RAP)

Neoenergia | Sobral Energy Transmission S.A.

Project that is part of lot 27, won by Neoenergia in the transmission auction 05/2016, held by the National Electric Energy Agency (ANEEL). The lot includes the expansion of the 500/230kV (Sobral III) substation with a 500 kV Static Reactive Compensator (-150/+250 Mvar), located in Ceará, which reinforces the National Electrical System, between the North and Northeast regions. The project was delivered 13 months earlier than the date originally scheduled, which was February 2021.

location_on

Ceará

calendar_month

2017 auction

cell_tower

Start of operation January/20

monetization_on

R$ 16 million (RAP)

Neoenergia | Santa Luzia

Formed by the Canoas, Lagoa I and Lagoa II parks. Located in the municipalities of São José do Sabugí, Santa Luzia and Junco do Seridó, in Paraíba, each one has 15 wind turbines with an installed capacity of 31.5 MW. The three parks started operating in the months of September and October 2017, the Group's first in the state of Paraíba and the first in the Sertano Paraíba region. The project was expanded with the construction of another 15 Neoenergia | Chafariz wind farms in the same region, making it the Company's largest wind complex in Latin America.

location_on

Paraíba/ Ceara

calendar_month

2017 auction

cell_tower

Start of operation December/21

monetization_on

R$ 76 million (RAP)

Neoenergia | Jalapão

The project is responsible for the Miracema — Gilbués II — Barreiras II and SE Associadas 500 kV Transmission Line project. Its construction aims to expand the electric power transmission grid in Brazil, facilitating the flow of energy from the Belo Monte Hydroelectric Power Plant. It will be 728.5 km kilometers long, crossing 19 municipalities. To this end, the Environmental Programs required by IBAMA for the installation phase of the project are in progress, presented below. Click on each of them for more information!

location_on

Tocantins, Bahia, Piauí and Maranhão

calendar_month

2017 auction

cell_tower

Start of operation January/22

monetization_on

R$ 167 million (RAP)

Neoenergia | Itabapoana

Acquired by Neoenergia in lot 3 of the National Electric Energy Agency (Aneel) auction in December 2018, the Itabapoana project aims to reinforce the flow of thermoelectric potential in the states of Rio de Janeiro and Espírito Santo. It has 221 kilometers of line, in double circuit, between the Mutum (MG) and Campos 2 (RJ) substations, with voltage at 500 kV. The project has operational synergy with another project acquired by the company in the same auction, the Guanabara project (lot 2). The asset is 322 kilometers long, in Rio de Janeiro, and has two substations.

location_on

Rio de Janeiro, Minas Gerais e Espírito Santo

calendar_month

2018 auction

cell_tower

Start of operation June/24

monetization_on

R$ 94 million (RAP)

Neoenergia | Rio Formoso

Purchased in lot 9 of auction 002/2019 by the National Electric Energy Agency (ANEEL), the project includes the construction of the Rio Formoso II substation (with two 230/138 kV transformation units with an installed power of 200 MVA each), the implementation of a new yard at the Rio das Éguas substation (with seven transformation units 500/230 kV of 100 MVA) and the construction of 105 kilometers of transmission line in 230kV, double circuit, for the interconnection of the substations.

location_on

Bahia

calendar_month

2019 auction

cell_tower

Start of operation January/23

monetization_on

R$ 22 million (RAP)

Neoenergia | Paraíso

Built throughout the state of Mato Grosso do Sul, the Paraíso das Águas project aims to increase the flow capacity of energy from renewable sources in the region. Executed in record time, the project was implemented in just 24 months after winning the ANEEL auction no. 002/2022, and has approximately 280 kilometers of line between the three substations Paraíso, Chapadão and Campo Grande, with voltage at 230/138kV.

location_on

Mato Grosso do Sul

calendar_month

2022 auction

cell_tower

Start of operation June/24

monetization_on

R$ 42 million (RAP)

Neoenergia | Estreito

Won in lot 4 of auction 02/2021 by the National Electric Energy Agency (Aneel), the project consists of an expansion of the 500 kV Estreito substation, located in the municipality of Ibiraci (MG), one of the main substations of the SIN and has three -300/+300 Mvar synchronous compensators. The asset contributes to the safety of the electrical system in the states of southeastern Brazil and expands opportunities for economic and social development in the region.

location_on

Minas Gerais

calendar_month

2021 auction

cell_tower

Start of operation June/24

monetization_on

R$ 44 million (RAP)

Neoenergia | Alto do Paranaíba

Built across the states of Minas Gerais and São Paulo, this project aims to expand transmission capacity and strengthen the reliability of the Brazilian National Interconnected System (SIN) in the Southeast region. Awarded under ANEEL Auction No. 1/2022 (Lot 2), the project consists of an extensive 500 kV transmission system, including the Arinos 2 - Paracatu 4, Paracatu 4 - Nova Ponte 3, and Nova Ponte 3 - Araraquara 2 transmission lines, as well as the Nova Ponte 3 Substation and the 440 kV Araraquara 2 - Araraquara Transmission Line, an important reinforcement to the transmission network in the state of São Paulo.
The project strengthens the transfer of electricity generated in Brazil's Central-West region to the country's main load centers, contributing to the security, reliability, and overall resilience of the national power system.

location_on

Minas Gerais

calendar_month

2021 auction

cell_tower

Start of operation June/24

monetization_on

R$ 44 million (RAP)

Neoenergia | Morro do Chapéu

Developed across the states of Bahia, Minas Gerais, and Espírito Santo, the Morro do Chapéu Project was designed to strengthen energy integration between Brazil's Northeast and Southeast regions, enabling greater transmission of renewable energy generated in the Northeast. Awarded under ANEEL Auction No. 1/2020 (Lot 2), the project comprises 500 kV transmission lines interconnecting Morro do Chapéu II, Poções III, Medeiros Neto II, and João Neiva 2, as well as a 230 kV transmission line linking Medeiros Neto II and Teixeira de Freitas II, and the 500/230 kV Medeiros Neto II Substation equipped with synchronous compensation. The project enhances the reliability of the power system and increases the energy exchange capacity between strategic regions of the country.

location_on

Minas Gerais

calendar_month

2021 auction

cell_tower

Start of operation June/24

monetization_on

R$ 44 million (RAP)

Neoenergia | Guanabara

Installed in the state of Rio de Janeiro, the Guanabara Project was developed to enhance the robustness of the state's transmission system and increase the reliability of energy supply for both the metropolitan region and the interior of the state. Awarded under ANEEL Transmission Auction No. 4/2018 (Lot 2), the project comprises approximately 656 kilometers of 500 kV transmission lines, including the Rio Terminal–Lagos and Lagos–Campos 2 sections, as well as the Campos 2 Substation and the expansion of the Lagos Substation. The project contributes to meeting growing electricity demand and strengthening the state's backbone transmission network.

location_on

Minas Gerais

calendar_month

2021 auction

cell_tower

Start of operation June/24

monetization_on

R$ 44 million (RAP)

Projects under construction

Vale do Itajaí

Paraná (PR)
Santa Catarina (SC)
December 2018 Auction
Scope: 673 km of transmission lines (TL)

Lagoa dos Patos

Rio Grande do Sul (RS)
Santa Catarina (SC)
2018 Auction
Scope: 769 km of transmission lines (TL)